Sim2 HT5000 Manual do Utilizador Página 4

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 14
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 3
1.2 Setting up the TCP/IP connection
The control system (or the PC) can establish a TCP/IP connection to the SIM2 HT5000 projector. The
basic steps required to add the projector to an existing Ethernet Networks are listed below.
Make sure the site has an Ethernet switch or router with a free 10BASE-T (10 megabits per second)
or 100BASE-TX (100 megabits per second) port for the projector.
Make sure a CAT5 (or better) twisted pair Ethernet cable with RJ-45 connectors is available. Check
that the maximum cable length requirement (100 meters or 330 feet) is met. Test the cable for proper
wiring.
Switch on the projector and make sure there is not a valid signal on the selected input (the OSD
displays the ‘No signal’ message). Enter the ‘Setup | Network Settings | IP Configuration’ page.
Assign the numeric IP Address (either Static or obtained using DHCP) of the projector and the Port
1 number. Select ‘Apply settings’.
Open the Control System (or the PC communication program) configuration panel and enter the
numeric IP address and the port number you got in the previous step.
Power cycle the projector (make sure the cool down routine has finished before switching off the main
switch).
1.3 Execution of the command
Command execution time may vary from 0.1 to 2.0 seconds, depending on the operation that have been
requested.
If the projector is busy when a command is sent, the unit may not accept the command. When several
commands are to be sent one after the other, sufficient time between them should be allowed.
When the projector is switched on from Standby, wait 40 seconds before sending commands to the projector
or reading messages sent by the projector.
4
Vista de página 3
1 2 3 4 5 6 7 8 9 ... 13 14

Comentários a estes Manuais

Sem comentários